Capacity 100-150m3/h mobile sand stone washing&gold separating plant

gold separating plant

gold mining equipment

Gold Mining Machinery technical process  

The Raw material into feed hopper by excavator or loader,then into trommel screen by swilling of water classified into 4size 0-6mm; 6-10mm; 10-30mm >30mm;
>30mm waste material transported by conveyor into scrap area;
10-30mm material transported by conveyor into destination area;
6-10mm material transported by conveyor into destination area;
0-6mm material into mineral box and send to knelson centrifuge 1200# horizontal automatic discharge gold concentrator to get concentrate,the waste material discharged from discharge pipe.

Gold Mining Machinery detail parameter


 Production Name


 Specification


 Quantity

 
Power


 Unit price

 
Total Price


 Remark


  ase plate

 Length 13m

1pcs 

-

Used trailer chasis


 Feed hopper

3500*3600 
 Steel thickness 10mm,including holding frame,water tank,water segregator

1set

-


Trommel screen

Inner diameter 1.3m,outer diameter 1.6m,screen mesh 4.3m

1set

11

knelson centrifuge
concentrator

 1200# horizontal gold concentrator

1set

21.5

Transport conveyor

Belt width 600mm,pole length 6m

3pcs

5.5*3

Sand pump&mineral box

4inch sand pump+11KW motor+mineral box

1set

11

Centrifugal pump

1set

5.5

Driving&directions system

2axles 8wheels

1set

-

Can be customized

Electric box

1pcs

-

Total power

65.5KW