Dredging depth 25m dredging boat with knelson centrifuge gold concentrator

gold dredger

Technical Process

The material from the bucket shipped into the trommel screen fixed with 4 reamers which can ream and wash the clay off,then to be separating into 3sizes <6mm,6-15mm>15mm,the biggest size useless are directly discharged to waste area by scrap sluice;

6-15mm material into shaking chute for recycling, scrap material discharged into the waste area;

The small size material <6mm gettinginto the material box through sand pump feeding into a horizontal automatic discharge gold concentrator,then concentrateget into concentrator box, scrap material to be get rid.